Make your next decision with confidence

A kitchen renovation, week by week

Plan your Newcastle kitchen renovation week by week, including design, cabinetry supply, strip-out, trade work, benchtop templating and final handover.

A clear scope. A useful conversation. No obligation.

Renovation programme from measure and design to build and handover

Bespoke planning diagram · illustrative, subject to site measure.

A kitchen renovation has a preparation period and a separate period without the finished kitchen. Design decisions, product supply and any approvals come before strip-out; cabinets must be installed before a templated benchtop is fabricated. Use the November 2026 example below to understand dependencies, then confirm your project-specific programme with us.

Start the clock at the right point

A start date can mean the first design meeting, release of a cabinet order or the day demolition begins. We make clear which milestone your programme refers to. A short installation period says nothing about how long you will wait for a particular door finish or appliance.

The following programme is an illustrative sequence, not a measured Newcastle average or a booking promise. It assumes a resolved approval pathway, available trades and no structural or hazardous-material complication. The timeline planner lets you replace the assumptions with supplier and contractor estimates.

Stage Example duration Dependency Household effect
Measure and design 2 to 4 weeks Access, brief and appliance choices Existing kitchen usually retained
Cabinet supply 4 to 8 weeks Approved drawings and order Keep using existing kitchen if safe
Strip-out and rough-in 1 to 2 weeks Delivery and trade readiness confirmed Kitchen disconnected
Cabinet installation 1 week Room ready and cabinets available Restricted work area
Benchtop template and fabrication 1 to 2 weeks Cabinets fixed and level Sink and worktop may remain unavailable
Fit-off, splashback and handover 1 to 2 weeks Top installed and finishes ready Services restored after checks

On a fully sequential reading, this example totals 10 to 19 weeks, including 4 to 7 weeks from strip-out. Real stages may overlap, but only count overlap agreed in your programme. Holiday closures, approvals and backorders can add time outside this example.

Before the cabinet order

Final drawings need more than room length and width. Confirm appliance openings, door swings, filler panels, finished floor levels and any ceiling or wall irregularity. Check how plumbing and ventilation routes interact with the cabinet layout. Approve a dated drawing revision rather than relying on the original concept.

Material selection belongs here too. A change of sink can alter a cut-out; a change of handle can affect clearances. The kitchen renovation checklist gives you a record of the decisions to close before procurement.

Before strip-out

Retain the existing kitchen until there is a credible installation plan. Confirm delivery dates, inspect accessible parts of the order and establish a protected storage area. A cabinet delivery without the correct panels or hardware may still be incomplete.

For a home built or renovated before 1990, use the NSW asbestos planning checklist to arrange appropriate assessment before disturbing suspect materials. This is a check based on building history, not a claim that every older home contains asbestos. Approval and strata questions belong in the NSW planning guide.

Let’s talk kitchens

A question about your own kitchen?

A short conversation can help you decide what to keep, what to change and what to budget for.

During rough-in and installation

We explain when water, power or cooking facilities will be unavailable. Keep children, pets and visitors out of the work area. Agree how dust protection, waste movement and daily access are managed, including any shared stairwell or driveway.

Cabinets need to be fixed, aligned and ready for the benchtop measurement. Templating too early can create a mismatch between the fabricated surface and the final room. The benchtop service guide explains the information required at that handover.

Living at home and finishing well

A temporary food-preparation area needs safe power, refrigeration and a practical washing arrangement. Do not assume the removed sink can be reconnected temporarily. Ask the contractor what is possible and cost it separately if needed. Meal delivery and temporary accommodation are household expenses outside most kitchen quotes.

At handover, walk through drawers, doors, lights, appliances, seals and visible finishes with the contractor. Record unresolved items with responsibility and dates. Collect product care information and relevant trade documents. Keep the approved drawings, contract and variations together so later questions can be traced to an agreed record. The cost guide helps separate contractor costs from household disruption allowances.

Questions before you enquire

How long will I be without a kitchen?

The illustrative programme allows 4 to 7 weeks from strip-out to handover, but it is not a measured local average. Confirm the actual period with us before disconnecting your kitchen.

Can cabinetry be ordered before approvals are resolved?

Only proceed when the responsible professionals confirm that the approved scope and ordering risk are understood. A drawing change after ordering can affect both cost and timing.

What happens if work uncovers damage?

We assess the problem, explain the required work and document any price or time change before the changed work proceeds.

Put your kitchen brief into words

Describe the changes you want, your suburb and any access constraints. Request a kitchen quote or call 02 4095 9066. We design, quote and build kitchens across Newcastle and Lake Macquarie. We confirm availability and the final scope with you, with work carried out by licensed NSW trades.

Your kitchen, with a little more possibility

Let’s make room
for something better.

Start a conversation about your project. We will confirm the site measure, scope and quote.

Call 02 4095 9066

We are your local kitchen renovation and custom joinery studio. We prepare your written quote and agree the work directly with you.

Request your free quote

Four quick details. A useful first conversation.

No obligation. Formspree processes enquiries in the US. We confirm availability and price.

Call NowFree Quote